Tău Bistra Dam (Barajul Tău Bistra) is a hydroelectric dam on the Sebeș River, near Tău Bistra village on the border between Alba and Sibiu counties. Built in a narrow mountain gorge, the curved concrete structure rises 78 meters above the valley floor and holds back Tău Bistra Lake, the second major reservoir in the Sebeș Valley hydroelectric system.
The dam was constructed between 1974 and 1984 as part of a large-scale project to harness the waters of the Sebeș River for electricity generation. Its double-curvature arch design allows the pressure of the reservoir to be transferred into the rocky sides of the gorge. The structure measures approximately 190 meters across its crest, which is just four meters wide, and incorporates spillway openings and outlets to regulate the flow of water.
Water collected in the reservoir, including the discharge from the upstream Gâlceag Hydroelectric Power Plant, is directed through an underground tunnel to the Șugag Hydroelectric Power Plant. Commissioned in 1984, the underground station has two Francis turbines with a combined installed capacity of 150 megawatts. This makes the dam an important part of the series of hydroelectric developments along the Sebeș River.
The dam stands beside the Transalpina Road (DN67C), where the narrow gorge opens toward the reservoir. From the surrounding road, the curved concrete wall and the steep forested slopes provide an impressive view of the engineering structure and its mountain setting.